Development & construction

Projects coming to life.

Illustrative film · Lodges des Combins · Grimentz

Automatic muted playback when this section comes into view.

01 / 06

The place and the project

Understand the site. Define the intentions.

Automatic muted playback 00:04 / 00:47

The film follows scrolling in both directions. The six markers and slider also let you choose a moment.

Illustrative construction film supplied by ImmoConcept
THE IMMOCONCEPT APPROACH · INTERACTIVE MODEL

From land to a living place.

Coordinated construction. Explained spaces. A checkpoint at each stage.

ELEVEN · ÉpalingesPlacement · Understanding the site
Reading diagram · The interactive 3D loads as you approach.
Drag to rotate ↔

The footprint and transparent outline locate the project before excavation.

Placement · Understanding the site
ImmoConcept leads and coordinates

Start with the right project.

We align the site, programme, budget and approvals. Architect and engineers establish placement, access and levels before preparing execution.

  • Assess site access, context and constraints.
  • Coordinate the programme, initial studies and budget.
  • Prepare approvals and the client’s decisions.
The checkpointAn identified programme, financial framework and set of reference drawings.

Cutaway reconstructed from the 29 October 2024 execution drawings and the 5 May 2025 ground-floor revision, Telmo Amaral Moreira. Reading views simplify heights, slopes and finishes. Exterior based on the 2022 structure. Educational sequence, not the exact construction schedule.

How we coordinate construction, in detail
  1. The site

    We align the site, programme, budget and approvals. Architect and engineers establish placement, access and levels before preparing execution.

    1. Study

      Bring together site constraints, access, programme and specialist studies.

    2. Decide

      Compare alternatives against the budget and client objectives.

    3. Approve

      Follow the application and authority discussions, and incorporate applicable conditions.

    4. Prepare

      Identify reference drawings, revisions, scopes and the contractor schedule.

    The people coordinated: Surveyor, architect, engineers, authorities and financing partners.

    An identified programme, financial framework and set of reference drawings.

  2. Foundations

    The basement is a complete part of the project: parking, cellars, bicycles, plant and circulation must work together. We coordinate excavation, structure, service openings and access before the ground-floor slab.

    1. Set out

      Coordinate the footprint, levels and access with site participants.

    2. Excavate

      Organise excavation, retaining works, material removal and neighbouring interfaces.

    3. Build

      Coordinate the foundation slab, buried walls, ramp, under-slab services and lift pit.

    4. Inspect

      Check levels, waterproofing, service routes and room access before covering.

    The people coordinated: Engineers, excavation and structural contractors, and site management.

    Placement, levels, waterproofing and service openings checked before covering.

  3. The floors

    Slabs, walls and circulation form the building’s real volumes. Each level rests on the one below, making the sequence of works a coordination task.

    1. Plan

      Sequence formwork, reinforcement, openings and concrete pours with contractors.

    2. Coordinate

      Bring architectural, structural and services drawings together to anticipate clashes.

    3. Inspect

      Have the responsible specialists follow placement, levels, openings and inspection points.

    4. Record

      Keep decisions, progress, cost effects and the programme current.

    The people coordinated: Site management, engineers, structural contractors and specialist trades.

    A checkpoint at each level before continuing structural works.

  4. The envelope

    The roof, façades, glazing and balustrades complete the volume. The junctions between elements matter as much as their appearance to the quality of the whole.

    1. Enclose

      Coordinate roof structure, roofing, windows, façades and weather protection.

    2. Connect

      Follow thresholds, balconies, waterproofing, insulation and drainage connections.

    3. Equip

      Anticipate shading, solar panels and building-services interfaces.

    4. Check

      Have contractors document checks and resolve interfaces before finishes.

    The people coordinated: Architect, envelope specialists, contractors and site management.

    Junctions checked before interior finishes.

  5. The spaces

    The cutaway uses execution drawings dated 29 October 2024, with the ground floor revised on 5 May 2025. Partitions, doors and access explain the homes and the attic activity spaces.

    1. Distribute

      Check partitions, passages, doors, room access and the shared circulation core.

    2. Install

      Coordinate electricity, heating, plumbing and ventilation before closing linings.

    3. Finish

      Sequence screeds, finishes, kitchens, bathrooms and joinery.

    4. Test

      Prepare building-system tests and record defects before acceptance.

    The people coordinated: Architect, building-systems specialists, contractors and site management.

    Checked spaces, tested systems and prepared defect records.

  6. A living place

    Completing works, acceptance and obtaining an occupancy permit are distinct milestones. We prepare visits, follow defects and assemble the handover documents for the building’s daily life.

    1. Accept

      Arrange inspections, establish acceptance records and list defects.

    2. Resolve

      Assign actions to contractors and follow resolution with closure evidence.

    3. Compile

      Gather updated drawings, manuals, tests, certificates and documents requested for occupancy procedures.

    4. Handover

      Follow authority discussions, then transfer keys, useful records and operating guidance to management.

    The people coordinated: Client, site management and contractors.

    ELEVEN: occupancy permit issued on 15 April 2026.

Projects in development

Gemini 1308, Lodges des Combins, Tufetsch and Les Aras.

Our completed projects

In Epalinges, ELEVEN illustrates our design, coordination and works management.

Let’s discuss your project.

A place, an idea or a question: share the context of your enquiry.